A machine shop can answer an RFQ promptly and still lose money if the customer sends a revised drawing after the quote. The dimensions, material or finish may have changed while the email thread still says “same part”. A useful RFQ portal must show exactly which file and assumptions produced each price.
This is a narrow problem, separate from a general manufacturing contact form. The buyer needs confidence that the quote covers the current design; the estimator needs a clean path to reprice a changed design.
Capture the complete quote package
Ask for part number, drawing or CAD file, quantity and expected repeat volume, material, finish, tolerance notes, destination and required date. Make a note of what is unknown rather than silently filling gaps. A customer might upload a PDF drawing and a STEP file that disagree; the estimator should flag that before quoting.
Give every upload a server-side identifier, timestamp and version number. Keep the original file; do not overwrite it when a new drawing arrives. The quote should point to an exact version, not merely to “latest drawing”. Document systems such as Autodesk Docs expose version history and comparison because changed files require a clear audit trail.
Freeze assumptions at quote time
The estimator should record the interpreted material grade, tolerances, inspection scope, tooling, minimum batch, lead time and shipping basis. Show the customer which assumptions are included and which require confirmation. If the drawing lacks a critical dimension, mark the quote provisional rather than estimating it invisibly.
When the customer uploads a revision, highlight that the current quote refers to an older drawing. Require the estimator to either confirm the price remains valid or issue a new quote. Keep both versions and both decisions. A version label in the filename alone is fragile because customers can reuse names.
Control approval and production handoff
After acceptance, record the accepted quote version, drawing version, quantity, target date and approval time. Production should receive that same package. If a later change arrives, create a change request with its effect on price and schedule. Do not edit the accepted record in place.
Access also matters: the customer should see only their own drawings, and shop staff should see files needed for their role. Validate download permissions on the server. OWASP's authorization guidance recommends checking access on every request rather than trusting what the interface hides.
Prove the workflow with one difficult example
Run a sample RFQ through two drawing revisions and a quantity change. Ask an estimator to show the price basis for each version and a production lead to identify the drawing that is authorized for manufacture. If either person must search email to know, the portal is missing a key link.
For a shop receiving repeat enquiries with technical files, I can map an RFQ and approval workflow around your estimating process. The first deliverable should be a versioned quote record, not a complicated customer dashboard.